1 research outputs found

    The optimisation of the estimating and tendering process in warship refit - a case study

    Get PDF
    The optimisation of a tendering process for warship refit contracts is presented. The tendering process, also known as the pre-contract award process (PCA), involves all the activities needed to be successfully awarded a refit contract. Process activities and information flows have been modelled using Integrated Definition Language IDEF0 and a Dependency Structure Matrix (DSM) with optimisation performed via a Genetic Algorithm (DSM-GA) search technique. By utilising this approach the process activities were re-sequenced in such an order that the number and size of rework cycles were reduced. The result being a 57% reduction in a criterion indicating 're-work' cycles
    corecore